- Messages
- 54,308
They used 44 men for 22 days. They cut, moved, and placed 186 stones (about 2 tons, to match of the precisely placed exterior stones).
The spacing was still being perfected (they had not had years of using those types of tools) but the Master Mason was sure that if they continued to work it would reach that level in a short time.
Yeah, 4600 years. lol lol