Darrell2688
A-List Customer
- Messages
- 400
- Location
- Piner, Kentucky
I like the sweatband method, makes everything easy, all the way down to the block size to use. I guess that you are getting to use the your formillion tool a lot.The initial consultation takes 60 - 90 minutes. Once the customer has chosen the felt I measure him up, size & shape Then I cut the sweat band and fit it to his head. This one step is great as I know when finished the hat will fit him as the sweat has been sized and I build the hat outward from the sweat.